Traffic

Click to Interact
Type
Location
Description
Time
incident
Benchwood RoadNone
Accident in Butler Twp on Benchwood Road at Miller Lane. Reported by Police
incident
OH-4SB
Accident. Two left lanes blocked in Huber Heights on Hwy 4 SB at New Carlisle Pike. Reported by ODOT
construction
US-42SB
Closed due to road construction in Delaware on US 42 SB between SR 257-Riverside Dr and US-33. Reported by DOT
construction
Orchard StreetNB
Closed due to road construction in Marion on Orchard Street NB between Holmes Pl and West Center Street
construction
I-70WB
Entrance ramp closed in Franklin on I-70 (Westside) WB on-ramp from Hilliard Rome Rd. Reported by DOT
incident
Edwin C Moses BlvdNone
Accident in Dayton on Edwin C Moses Blvd at Cincinnati St. Reported by Police
incident
E Helena StNone
Accident in Dayton on E Helena St at Main St. Reported by Police
incident
Butler Warren RdBoth NB/SB
Reopened in Middletown on Butler Warren Rd NB/SB at Dimmick Rd/Irwin Simpson Rd
construction
OH-117Both EB/WB
Road construction. Single line traffic-alternate directions in Allen on OH-117 EB/WB at Hwy 501/S Wapak Rd/S Wapakoneta Rd. Reported by ODOT
construction
I-75NB
Road construction. Roadway reduced to one lane in Lima on I-75 NB between Blue Lick Rd/Exit 130 and OH-696/Napoleon Rd/Exit 134. Reported by ODOT
construction
Raymond RoadBoth NB/SB
Closed due to road construction in Marysville on Raymond Road NB/SB between West 5th Street and Dog Leg Road. Reported by DOT
construction
OH-37Both NB/SB
Closed due to road construction in Union on SR 37 (Delaware) NB/SB between SR 47 and SR 739. Reported by DOT
construction
OH-95Both EB/WB
Construction work in La Rue on OH-95 EB/WB between South High Street and Mount Olive Agosta Rd. Reported by DOT
construction
OH-48Both NB/SB
Paving operations in Warren on SR 48 NB/SB at I 71. Reported by DOT
construction
OH-63WB
Road construction. Right lane closed in Warren Co on SR 63 WB at Route 741. Reported by DOT
construction
OH-123Both NB/SB
Paving operations in Morrow on SR 123 NB/SB between Mason Morrow Millgrove Road and SR 350. Reported by DOT
construction
OH-274Both EB/WB
Road construction during the day time in Auglaize on SR 274 EB/WB between SR 29 and Staley Rd. Reported by ODOT
construction
OH-235Both NB/SB
Utility work in New Carlisle on SR 235 NB/SB between E Madison St and Mill Rd. Reported by ODOT
construction
OH-29Both EB/WB
Road construction during the day time in Shelby on SR 29 EB/WB between I-75 and Mccartyville Rd. Reported by ODOT
construction
US-40Both EB/WB
Resurfacing work in New Carlisle on US 40 EB/WB between Whaley Rd and SR 4. Reported by ODOT
On AirK99.1FM - New Country Logo

The K-Club Newsletter